  • Project Year Six 2023-2024
  • Project Year 2024-2025
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture

A lot was accomplished in 2025. I had the septic completed. The stoop was put on the front of the house. The well was put in. Inside walls were framed and sheet rock was started. Plumbing started to go into the interior walls. I purchased my gas stove, refrigerator, as well as toilets, shower and sinks. It is starting to look like a home. Almost there.....